DBSector · Corporate
Oracle 10g to 19c migration
Databases, 22 h cut down to 10 min
22 h
initial duration
10 min
achieved duration
Drag to compare the operating time
22 h
10 min
← Before (initial duration)After (achieved duration) →
Challenges
Upgrade an obsolete Oracle 10g database, with a minimal downtime window.
Services
Preparation, automation and cutover testing led by the Oracle and PostgreSQL practice.
Results
A 22-hour operation cut down to 10 minutes.
Technologies
Oracle 19cAutomation
Expertise
OTHERS




